New buildings
Nowadays, most developers during their work are faced with different types of high -rise work. Immediately, we note that this type of work belongs to the category of increased danger, and they can only be carried out if there is an official outfit, which, as you know, contains a set of measures of a technical and organizational nature, accompanying the process of completing tasks and the basic stage of their implementation.
As you know, high-rise work is carried out in Kyiv, Kharkov, Moscow, St. Petersburg and other major cities of the CIS countries.
These types of work include construction and installation processes, performed at a height of five meters above the ground or floor slab. Any high -altitude work is carried out only if there are several insurance.
Consider what information the standard outfit must contain?
Each construction organization develops the composition of information for the corresponding outfit, which has the maximum accounting of the specifics of the work ongoing. This developed document must be approved by the Administration of the Company.
The main data that should contain an outfit-transfer:
– Accurate place of work;
– An accurate description of high-altitude work, the end time and the start of the work of builders and lodges;
– The total number of people of the working composition;
– General conditions for the work above the Earth;
– A list of persons who are responsible for the work of a high level of danger.
Note that the best option looks like the one in which the permit is supplemented by the necessary technological schemes and cards, warning signs, sketches of protective devices and structures.
If high -altitude work must be carried out in buildings that are territorially located in security zones, then it is imperative to enlist the written consent of the owner of the object. Any company engaged in high-altitude work should adhere to time parameters that are directly indicated in the output.
When it is not possible to meet the specified time period, then it is necessary to annul the order outfit, as well as initiate the issuance of a new. Only after these measures it will be possible to resume high -rise work.