Before starting the construction of the house, you should prepare a construction site. This preparation can be divided into several stages. The plot must be clear, provide access to the site, determine the place of storage of building materials, perform a special embankment, prepare a place for storage of garbage, install temporary communications, and also ensure the accommodation of builders.
It is necessary to take care of the tools and equipment in advance, which can be useful during the preparation of the construction site, as well as during construction or repair, you can find out by contacting: .
Access to the site is ensured by the arrangement of the access road. Lifting and freight transport should freely move along this road. Note that in the winter, when preparing the site, snowplifier equipment may be required. When preparing the path, the roadway is temporarily freed from extraneous objects.
After the necessary access to the construction site is provided, we proceed to its clearing. As a rule, areas that do not require clearing are rare enough. Each site has its own characteristics, and, based on this, they perform various work and use various equipment. So, for example, a chainsaw can be used to clear the areas on which unnecessary trees grow.
At the next stage, a special embankment is organized. From what features the place of the future building will have, crushed stone, reinforced concrete pipes and sand will be required to perform the embankment. Pipes are needed to drain groundwater. We should not forget that the embankment gives a shrinkage, which means that before the completion of construction work, lay asphalt or other coating is not recommended.
The place for storage of building materials is chosen so that the distance to the construction from the warehouse is as low as possible, and at the same time the warehouse does not block the path of the necessary transport and construction equipment.