In order to increase the service life of the parquet, it must be periodically updated. Deformed, worn strips should be replaced. To do this, remove the damaged bar, clear the place under it, and then put a new bar in its place and nailed. If the Parquet Parquet, the bar is glued with a special mastic and pressed with a load for a day to improve clutch.
Further, the parquet needs to be polished. Before the grinding starts, the skirting boards must be removed so that they do not interfere with completely remove the old varnish from the entire surface of the parquet. In addition, before grinding, the floors must be thoroughly washed, removing all the dirt and dust. A special grinding machine is used to polish the parquet.
Then the parquet should be putty with a special putty for wood. The putty must correspond to the color of the parquet and can be acrylic, on a water -based or based. Using a small spatula, all scratches and cracks should. After waiting for the putty to completely dry, the treated surface is polished with sandpaper. Remove all the dust formed as a result of grinding, treat it with a primer.
After the surface of the flooring is completely dried up to varnish it. When buying varnish, you need to focus on its type and consumption rate. In most cases, one liter of varnish is enough to process the surface with an area of 8-10 kV in one layer. m. Parquet staining varnish is carried out using a wide brush or roller. In the case of using the brush, varnish is applied with wide U-shaped movements, and when using a roller of movement should be crucial. You can also use a spray gun for staining parquet. Varnish is applied to parquet in 2-3 layers. It should be remembered that the application of each next layer is possible only after the previous. When working with varnish, take care of protecting the respiratory and skin organs.
In order to avoid defects and pollution of the varnish coating during work, all doors and windows in the room must be closed. The humidity in the room should not exceed 50 percent, and the temperature should be within 15-22 degrees.
Intensive operation of the parquet is possible no earlier than 3 days after.