On November sixth, a meeting of a professional workshop was held at the premises of the Kirovograd city council on the topic: “On the state of construction, the prospect of completion and reconstruction of the premises of schools and preschool educational institutions”. The event was held by the head of the Education Department of the Kirovograd City Council Larisa Kostenko and the Executive Director of the Regional Branch of the Association of Cities of Ukraine Valentina Ilyushkina. And the directors of those schools and preschool educational institutions, where overhaul or completions have already been carried out, took part in it, or they last, or they are planned to be carried out.
Larisa Kostenko in her report analyzed the indicators of the work of the education industry and the state of the provision of educational services to Kirovogradov. She told: the capital and currently repairs of the educational institutions, the implementation of the regional target program “School desk”, on the provision of technological equipment of canteens and laundries, the introduction of energy -protection technologies into the Zosh and the DNS of Energy Supporting Technologies, and the creation of conditions for the safe and comfortable stay of children in the institutions of education institutions and about the prospects for the development of the educational industry in Kirovograd.
Directors of Zosh No. 2 and 15 talked about the construction of new educational buildings in the schools headed by the schools (in the 15th on the ground floor of the new three-story building will be valid). The head of Zosh No. 21 spoke about the functioning of two preschool groups at the school, and the director of Zosh No. 12 – about the overhaul, as a result of which internal bathrooms were created in the educational institution, several entrance doors were replaced, metal -plastic windows were inserted, water supply networks were replaced and repairs were drawn to the end gym. The head of the Zosh team No. 33 assigned the audience that the school began overhaul and reconstruction of its premises for placing a preschool educational institution in it.
If there is no way to build new, comfortable educational institutions from scratch, then the question of redevelopment, overhaul, overhaul of the existing old, places of collapsed buildings of the country’s educational system, is quite relevant today. And how it is pleasant for children to come to classes in the renovated room. Even new forces appear to absorb knowledge. The authorities of the Kirovograd region do everything possible for arranging a favorable atmosphere to clarifies.