Before you start installing the DAB pumping station, it is necessary to additionally carry out work on checking the air pressure in the air tank air cavity. This will allow you to safely and reliably install the station. If pressure problems are found during the audit, then it must be adjusted. The freedom of rotation of the nose shaft also needs to be checked and adjusted. Most often, to eliminate these problems, you just need to turn the fan blades, which are under the rear cover of the pump, using a screwdriver. Rotation should occur evenly and freely without any obstacles. This position is characteristic of Pedrollo, Needle, and T pumps. D. See the detailed information and description of the stations on a special website.
To facilitate the installation and dismantling process, it is necessary to install on the pressure and suction line on a separate valve. Next, you need to check how the bolts are tightened on the mounting of the pump to the hydraulic tank itself. This avoids all additional vibrations of the installation. The entire installation must be attached to the floor using special bolts. Hydrobaka’s paws allow this to do this. In pure state, it is necessary to contain the electric motor of the pump itself. This will ensure reliability in cooling.
The rapidly detachable joints of the American type must be used to connect a pressure pipeline with a suction. This will save time when installing the structure.
The check valve in the pump is not the detail on which you can save. The trunk or bottom valve must be chosen high -quality. After all, it affects the life of the entire installation. If the valve after some time begins to skip water, this will lead to urgent repairs.
As a result, you will have to purchase a better valve. But it could be installed at the very beginning, and then this problem would not have arisen. If we take into account the fact that you will have to disassemble all the pipes in order to get to the valve, then the task receives an additional complication.