The use of a magneto building of this technology after many years of applying a “closed” method was carried out in the practice of recent years for the first time.
With a streaming sequence of work on five captures, foundations were built and delivered to the building and equipment with the device of engineering networks and communications with filling at the zero mark, after which the steel structures of the roof cover of the building are mounted and black floors were arranged. The final stage of work on the captures was the installation and commissioning of bridge cranes, with which, instead of 12 months, instead of 12 months, the technological equipment of a line weighing 22.8 thousand tons was mounted, established and commissioned. The cost of construction work was reduced by 16.4% . Professional Project Bureau knows how to calculate the work correctly. Turning to reliable specialists, you are guaranteed to get an excellent result.
Experience has shown that the technology of high -speed production construction of the main production buildings of rolling stones with vertical captures from the head to the tail is most effective. Maximum cargo flows are provided in the separate production of earthen, concrete and reinforced concrete work, reverse bedding, soil compaction, black floor devices; The maximum cargo floods of installation of building structures of buildings and structures, and then the maximum cargo flowing of equipment.
The optimal concentration of resources, the continuity and rhythm of the production of all types of work on captures and high labor productivity is achieved. Powerful construction and installation equipment is used as much as possible. The number of installers is sharply reduced.
The increasing areas and volumes of the main production buildings and the physical volumes of each type of construction and installation work on new high -performance rental camps do not increase their duration, but on the contrary, they are reduced compared to a closed way and require a smaller number of workers for the installation of technological and other equipment, as well as building structures of the building.
High -performance self -propelled scrapers are used to develop a common foundation for the equipment and columns of the building.
The total duration of the construction, input and the development of the design capacity of the rolling mill is sharply reduced.